Krauklīši means little ravens. The name came with the land and nobody intends to change it — it is more accurate than anything we could have invented.
There is almost nothing here yet: a field, a line of forest along the northern boundary and a great deal of sky. What follows is the plan. Some of it is already growing, some exists only in drawings, and some is honestly labelled as intention.
Skrīveri
The land lies at Skrīveri, in the middle of Latvia, on the right bank of the Daugava about seventy-five kilometres upstream of Riga. It is quiet, level country: river valley, oak groves, pine on the sandy rises, and farmland that has been worked for a very long time without ever becoming industrial.
Skrīveri is known in Latvia for two things — a dendrological park laid out around a nineteenth-century manor, still one of the richest collections of trees in the country, and a milk fudge that most Latvians ate as children. Both tell you roughly what kind of place it is: green, unhurried, and slightly sweeter than it needs to be.
Two hectares of it are ours, and the rest is the reason they are worth having.
- Parish
- Skrīveri
- Municipality
- Aizkraukle
- Region
- Vidzeme, central Latvia
- River
- Daugava
- To Riga
- ≈ 75 km
- Nearest station
- Skrīveri, Riga–Daugavpils line
- Worth the detour
- Skrīveri dendrological park
What is planned
Nothing here is finished. This is the order things are meant to happen in, and where each of them is described.
| When | Work | Described in |
|---|---|---|
| 2027 | Borehole, power and the gravel approach | House |
| 2026–2029 | The garden planted in thirds, one third a year | Garden |
| 2028 | Excavation, slab and the concrete shell | House |
| 2028 | Twelve raised beds and the greenhouse | Kitchen garden |
| 2029 | The pond dug at the low corner | Pond |
| Ongoing | Registers kept, journal written, nothing hurried | Field journal |
Dates are intentions, not commitments
Registers & records
Wildlife register
Every bird, mammal and amphibian recorded on the land, with status and first sighting.
Open → RegisterPlant register
Thirteen taxa, with family, height, flowering period and planting date.
Open → DataClimate & sun
Monthly normals, growing season, and a sun study computed for this latitude.
Open → ArchiveDocuments & data
Cadastral extract, soil survey, management plan and the drawing set.
Open →From the field journal
All entries →Section 1 · The Land
The Land
Two hectares of former pasture on a low rise, bounded by forest to the north and a field road to the west.
Overview
The plot is an irregular quadrilateral, roughly 145 by 140 metres, rising some three metres from the south-eastern corner to the northern boundary. That fall is the single fact that determined everything else: water collects at the bottom, so the pond went there, and the house went to the high, dry, western side where the approach already existed.
Before us the land was pasture and then, for about fifteen years, nothing at all. What grows here now is what arrived on its own — a good indication of what will survive being planted deliberately.
Two hectares is small enough to walk in seven minutes and large enough to lose someone in.
- Area
- 2.00 ha · 20,000 m²
- Dimensions
- ≈ 145 × 140 m
- Perimeter
- 566 m
- Relief
- +3 m south-east to north
- Aspect
- Open south and east
- Previous use
- Pasture, then fallow
- Access
- Field road, west
Site plan
Four zones around one house. Choose any of them to open its chapter.
0 — 25 — 50 mScale 1:1000 · north at top · drawing KR/D-03
Boundaries & turning points
Four turning points, marked on site with driven posts. Coordinates are withheld pending survey registration.
| Point | Bearing | Length | Adjoining | Marker |
|---|---|---|---|---|
| н1 — н2 | 88° | 146 m | State forest | Oak post |
| н2 — н3 | 177° | 139 m | Arable field | Oak post |
| н3 — н4 | 268° | 142 m | Drainage ditch | Boundary stone |
| н4 — н1 | 356° | 139 m | Field road | Oak post |
Total perimeter 566 m
Soil & geology
Three test pits were dug in the first spring, one in each intended planting zone. All three found the same profile: a thin, dark topsoil over sandy loam, over glacial till at about a metre. Drainage is free everywhere except the south-eastern corner, where the till comes closer to the surface and water stands after rain.
The soil is mildly acidic, which suits the planting list and rules out anything that wants chalk.
- Topsoil
- 18–24 cm, humic sandy loam
- Subsoil
- Sandy loam to 95 cm
- Parent material
- Glacial till
- pH
- 5.8 – 6.3
- Organic matter
- 3.1 %
- Drainage
- Free, except SE corner
- Frost depth
- 0.9 m design value
Hydrology
No stream crosses the land. Everything that falls here either soaks away or walks downhill to the south-east corner, which is why the pond is where it is.
- Annual rainfall
- 692 mm
- Water table, summer
- 2.4 m
- Water table, spring
- 1.1 m
- Borehole depth
- 38 m
- Fall across site
- 3.0 m
Management zones
The land is managed as five zones with different intensities. Roughly four fifths of it is deliberately left alone.
| Zone | Area | Share | Regime | Interventions / year |
|---|---|---|---|---|
| Rough meadow | 10,290 m² | 51 % | Mown once, late August | 1 |
| Garden | 8,200 m² | 41 % | Paths mown, beds cut in March | 14 |
| Pond | 620 m² | 3 % | No intervention | 0 |
| Kitchen garden | 330 m² | 2 % | Continuous cultivation | — |
| Built & paved | 560 m² | 3 % | Swept | — |
Left unmanaged or near-unmanaged 54 %
Section 1 · The Land
Climate & sun
A short summer, a long dusk, and a sun that in June barely bothers to set.
Monthly normals
Mean daily maximum shown as bars, mean daily minimum as a line. Hover a month for the figures.
| Month | Max °C | Min °C | Rain mm | Frost days | Daylight |
|---|
Annual mean +6.8 °C · annual rainfall 692 mm
Growing season
- Season begins
- 21 Apr
- Season ends
- 14 Oct
- Length
- 176 days
- Last spring frost
- ≈ 12 May
- First autumn frost
- ≈ 28 Sep
- Hardiness
- 5b
Season defined as the run of days with mean temperature above +5 °C
Sun study
Solar position computed for 56.95° N in true solar time. Move the slider, or run the whole day.
The house entire
Seven rooms in a ring around an open courtyard.
Courtyard receives direct sun above 22.2° altitudeDrawing KR/D-11
Daylight through the year
Computed sunrise and sunset in Latvian local time. The difference between midsummer and midwinter here is more than ten hours.
| Date | Sunrise | Sunset | Daylight | Noon altitude |
|---|
Times are computed, not measured; the equation of time is not applied
Chapter I
House
An octagon folded around a garden of its own
The idea
One storey, board-marked concrete, a flat roof.
The plan is a regular octagon with eight-metre sides.
The reasoning is simple. An octagon has no back.
The courtyard is also a climate.
The house does not stand in the landscape. It cuts a piece out of it and keeps it.
- Form
- Regular octagon
- Side
- 8.0 m
- Across
- 21 m corner to corner
- Under roof
- 257 m²
- Courtyard
- 55 m²
- Ceiling
- 3.6 m
- Structure
- Cast in-situ concrete
- Roof
- Flat, accessible
- Cladding
- None
Schedule of rooms
Seven rooms in a ring. Each faces the courtyard on one side and open ground on the other.
| Room | Area | Aspect | Outer wall | Own door |
|---|
Total enclosed 257 m² · courtyard 55 m²
The interactive sun study for this plan lives on the Climate & sun page →
Materials schedule
| Element | Material | Finish | Note |
|---|---|---|---|
| External walls | Cast in-situ concrete, 300 mm | Board-marked, unsealed | Formwork grain left visible |
| Roof | Reinforced slab | Gravel ballast | Accessible, no parapet rail |
| Floors | Polished screed | Waxed | Underfloor heating throughout |
| Glazing | Triple, timber-framed | Oiled larch | Full height to courtyard |
| Courtyard floor | Granite setts | Split, laid on sand | Open joints, planted |
| Entrance door | Solid oak | Untreated, left to grey | West elevation only |
Build sequence
| Stage | Work | Intended | Status |
|---|---|---|---|
| 0 | Acquisition and boundary marking | 2026 | Done |
| 1 | Borehole, power, access track | 2027 | In progress |
| 2 | Excavation and slab | 2028 | Planned |
| 3 | Concrete shell and roof | 2028 | Planned |
| 4 | Glazing and fit-out | 2029 | Planned |
| 5 | Courtyard planting | 2029 | Aspiration |
Chapter II
Garden
Perennials, grasses and no lawn whatsoever
Approach
The garden takes the eastern half of the site.
The planting is dense and layered.
Everything chosen already grows in Latvia of its own accord.
The only thing trimmed here is the path.
- Area
- 8,200 m²
- Type
- Naturalistic, layered
- Peak
- June to September
- Winter structure
- Left standing
- Irrigation
- First season only
- Mowing
- Paths, fortnightly
- Cutting back
- Once, in March
Flowering calendar
Choose a month to see what is in flower and what is standing as winter structure.
Flowering calendar
Thirteen plants, twelve months
Full plant register →Periods are observed on site, not taken from catalogues
Through the year
Spring
Bulbs pushing through last year's stems.
Summer
Full height: umbellifers, geraniums, salvias.
Autumn
Grasses take over.
Winter
Nothing cleared.
Maintenance calendar
| Month | Task | Hours | Note |
|---|---|---|---|
| March | Cut everything back to 10 cm | 14 | The only cut of the year |
| April | Spread compost, no digging | 6 | 2 cm, from the kitchen garden bays |
| May | First path mowing | 3 | Then fortnightly to September |
| June | Spot-weed thistle and dock | 5 | By hand, no chemicals |
| August | Mow the rough meadow | 8 | Cuttings removed |
| October | Nothing | 0 | Deliberately |
Total garden labour ≈ 36 hours a year
Register · Flora
Plant register
Everything deliberately planted, with the date it went in and whether it has settled.
The list
Sort by any column. Filter by layer, or search by name and family.
| Species▲ | Family▲ | Layer▲ | Height▲ | Flowering▲ | Planted▲ | Year▲ |
|---|
Chapter III
Kitchen garden
Raised beds, gravel walks, deliberate geometry
Overview
The only place on the property with straight lines.
The beds are forty centimetres high, because one only has one back.
What grows here is whatever is worth carrying from round the corner.
The kitchen garden sits beside the kitchen, not at the far end of the land.
- Area
- 330 m²
- Beds
- Twelve
- Bed size
- 1.2 × 4.0 m
- Height
- 40 cm
- Paths
- Gravel, 80 cm
- Greenhouse
- 18 m²
- Compost
- Three bays
- Walk from kitchen
- 40 m
Bed layout
Drawing KR/D-21 · scale 1:100Rows run north–south
Four-year rotation
Three beds per group, moving one group along each year. Nothing returns to the same bed inside four years.
| Group | 2026 | 2027 | 2028 | 2029 |
|---|---|---|---|---|
| Beds 1–3 | Leaf | Legume | Root | Fruit |
| Beds 4–6 | Legume | Root | Fruit | Leaf |
| Beds 7–9 | Root | Fruit | Leaf | Legume |
| Beds 10–12 | Fruit | Leaf | Legume | Root |
Fruit = courgette, squash, tomato under glass · Leaf = salads, herbs, chard
Chapter IV
Pond
For swimming in, not for looking at
Overview
The pond sits in the south-eastern corner, at the lowest point of the site.
The water is live and untreated.
In winter it freezes and becomes one more reason to leave the house.
The only thing on this land that produces nothing.
- Water surface
- 620 m²
- Swimming zone
- 410 m²
- Regeneration zone
- 210 m²
- Depth
- up to 2.0 m
- Edge
- Sand and timber deck
- Filtration
- Biological
- Fish
- Under discussion
Cross-section
Drawing KR/D-31 · vertical scale exaggerated ×2Looking north
Water & planting
| Zone | Depth | Area | Planting | Role |
|---|---|---|---|---|
| Sand shelf | 0 – 0.5 m | 90 m² | None | Entry, children |
| Planted shelf | 0.5 – 1.2 m | 120 m² | Typha, Iris pseudacorus | Biological filter |
| Deep zone | 1.2 – 2.0 m | 410 m² | Nymphaea (margins) | Swimming |
Regeneration share 34 % — the minimum for unassisted clarity
Register · Fauna
Wildlife register
Everything seen or heard on the land since the first spring, with the date it was first recorded.
The ravens
The place is named after them, so they get a paragraph of their own. A pair of Corvus corax holds the tall spruce at the north-western corner and has done since before we arrived. They are the first thing you hear from the road and the reason the name was never up for discussion.
They are not tame and will not become tame. In four years they have permitted us to walk the northern path without comment, which for a raven counts as friendship.
- Resident pair
- Since before 2026
- Nest
- Spruce, NW corner
- Young fledged
- 3 in 2026
- Territory
- Well beyond the boundary
- Status
- Resident
Recorded species
Sort by any column. Filter by group, or search by name.
| Species▲ | Common name▲ | Group▲ | Status▲ | First recorded▲ | Where |
|---|
New wildlife record
Records are our own observations. Nothing here is a formal survey.
Record
Field journal
Short notes written on the land, in the order they happened.
New journal entry
Archive
Documents & data
Everything on paper, and the drawing set. Held privately; listed here for completeness.
Register of documents
| Ref | Title | Type | Date | Status |
|---|---|---|---|---|
| KR/A-01 | Cadastral extract | Official | 2026-02 | Held |
| KR/A-02 | Boundary survey report | Survey | 2026-03 | Held |
| KR/A-03 | Soil test pits — three profiles | Survey | 2026-04 | Held |
| KR/A-04 | Borehole log, 38 m | Technical | 2027-05 | Pending |
| KR/A-05 | Management plan 2026–2036 | Plan | 2026-06 | Held |
| KR/A-06 | Planting schedule, garden | Plan | 2026-04 | Held |
| KR/D-03 | Site plan, 1:1000 | Drawing | 2026-03 | Held |
| KR/D-10 | House — floor plan, 1:100 | Drawing | 2026-07 | Draft |
| KR/D-11 | House — sun study | Drawing | 2026-07 | Draft |
| KR/D-21 | Kitchen garden — bed layout | Drawing | 2026-05 | Held |
| KR/D-31 | Pond — cross-section | Drawing | 2026-06 | Concept |
Nothing here is downloadable. Ask if you need a copy.
How references are formed
Every page, drawing and record on this site carries a reference. The system is deliberately dull.
| Prefix | Meaning | Example |
|---|---|---|
| KR/L | Land — the ground itself | KR/L-01 |
| KR/B | Building | KR/B-01 |
| KR/G | Garden | KR/G-01 |
| KR/K | Kitchen garden | KR/K-01 |
| KR/W | Water | KR/W-01 |
| KR/R | Register | KR/R-02 |
| KR/D | Drawing | KR/D-11 |
| KR/J | Journal entry | KR/J-07 |
Practical
Visiting
Private land. Come if you are asked, and read the four rules before you do.
Getting here
The land lies on a field road with no name and no number. Coordinates will be given when you are invited; there is no point publishing them, because there is nothing here to visit unannounced.
The last four hundred metres are gravel and, in March and November, are gravel with opinions. Anything with normal ground clearance manages it; anything low does not.
- Last surfaced road
- 1.4 km
- Gravel approach
- 400 m
- Parking
- Three cars, west boundary
- Walk to the house
- 90 m
- Mobile signal
- Patchy; better by the pond
When to come
April – May
Mud, birdsong, and the whole year still theoretical. Bring boots.
June – August
The reason for all of it. Light until eleven, swimming, and the garden above head height.
September – October
The best light of the year and the grasses at their peak. Cold at night.
November – March
Frost, silence, and nothing to do. Some people prefer it.
Four rules
Nothing gets cut without asking
Fires only in the hearth
No lights after dark
The ravens were here first
What to bring
| Item | Why | Season |
|---|---|---|
| Boots that can be ruined | There is no path to most of it | All year |
| Drinking water | The borehole is not connected yet | All year |
| One more layer than you think | Open ground, and the wind knows it | All year |
| Insect repellent | Standing water, warm evenings | June – August |
| Towel | The pond is not decorative | June – August |
Colophon
About the project
A private record of two hectares, kept mostly so that in ten years we can check what we said we would do.
Why this exists
The land was bought in 2026. Almost nothing has been built. That gap — between what exists and what is intended — is the whole subject of this site, and the reason every page is marked with a status.
Anything described as held, done or measured is real. Anything marked design, planned, draft or aspiration is not, however confidently it may be drawn. The registers are our own observations rather than formal surveys, and the figures are working estimates revised each season.
The sun figures are computed rather than measured, which makes them the most reliable numbers here.
How the site is made
| Aspect | Detail |
|---|---|
| Typeface | Didot for Latin, Cochin for Cyrillic — one voice, four alphabets |
| Drawings | Vector, drawn to the same dimensions as the schedules |
| Sun study | Solar declination and hour angle, computed live for 56.95° N |
| Weather | Live forecast where the network allows it; monthly climate normal otherwise |
| Languages | English, Latvian, Russian, Ukrainian |
| Data | Held in the page; nothing is sent anywhere |
Contact
There is no form and no mailing list. If you know us, you know how to ask; if you have found this by accident, welcome, and there is nothing you need to do.
Not found
Nothing here
Which, given the subject, is at least consistent.